Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
Two crew members rake fresh asphalt on a rural road beside a harvested field.
The Lower Road demonstration used SIP-1111™ to formulate PG 58-28 binder from hard 30-penetration asphalt. The 30% RAP mix raised the reported cracking-test indices and recorded 5.1 mm Hamburg deformation versus 4.5 mm for the 15% RAP control at 45°C.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
A paver, red haul truck, roller, and crew work in the Indiana Soybean Alliance parking lot.
One section of the Indiana Soybean Alliance parking-lot demonstration paired 40% RAP with BioMAG™ and supplemental SIP-1111™, reaching approximately PG 64H-28 and exceeding the project summary's cracking thresholds.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
Three photographs show the paving crew, fresh asphalt, and paving train on West Cliff Street in St. Joseph.
A city-street demonstration in St. Joseph paired 25% RAP with BioMAG™ and retained the modified binder's continuous performance-grade range after recovery.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
A paver and orange roller place a black asphalt mat beside fields at the BioCentury Research Farm.
The BioCentury Research Farm demonstration paired 18% RAP with a 6% BioMAG™ and 2% SBS formulation that delivered a broad continuous binder grade range and strong MSCR recovery.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
Two views show crews paving the Altoona BioMAG roadway section.
Altoona paired 20% RAP with BioMAG™, a 50% SIP-1111™ rejuvenator and 50% biopolymer formulation, in a full-scale Iowa roadway demonstration.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
Three crew members stand on a paver placing a fresh asphalt mat at the NCAT Test Track.
A BioMAG™ section built with 20% RAP entered accelerated truck traffic at the NCAT Test Track in 2018 and accumulated approximately 20 million ESALs with minimal surface distress.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
A paver, red haul truck, and crew place asphalt in a parking lot beside an office building.
A 600-ton SIP-1111™ production run combined 35-36% RAP and 5% RAS with PG 70-16 recovered-binder performance and results from two laboratories.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
City Asphalt drum plant silos and production equipment under a blue sky in Staten Island.
A Rutgers CAIT field study found that the 45% RAP SIP-1111™ mixture met both report-cited rutting and cracking thresholds.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
An asphalt plant operates at dusk with a red haul truck in front.
A Mason City demonstration reports higher CT Index and DCT fracture energy for its 45% RAP SIP-1111™ design than for the matched 45% RAP TuffTrek design.
Saturday, 25 July 2026 / Published in Demo Projects, SIP-1111™, SIP-1111™ Rejuv
A roller and paving crew work beside the Indiana Soybean Alliance headquarters.
A 500-ton Indianapolis parking-lot trial compared 40% RAP with SIP-1111™ against a 25% RAP control, measuring recovered-binder, DCT, and Hamburg performance.